
Add to Cart
High Quality Plastic pet preform mold/water bottle preform molds/plastic bottle mould
Name | Description |
Mould material | 45#, P20, 718, 2738, S136 etc. |
Mould base | C45#, LKM, HASCO etc. |
Cavity | Single / Multi-cavity |
Runner | Hot / Cold |
Mould design | 3D / 2D Drawing |
Design days | 2-3 days |
Design software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic material | PET,PP,PE,ABS,PS,PC, etc. |
Mould life | 3,000,000 shots |
Packing detail | waterproof film & painted anti-rust oil put in Wooded case |
Polish system | Mirror polish |
Payment | T/T, 50% deposit , 50% before shipment |
Delivery time | 10-15 days |
Specification | Depends on customers requirements |
Business Step:
1. R&D | We support customer R&D. Make the files or improve the design if you needed |
2. Quotation | Quotation will according to our customer information |
3. Negotiation | The quality, price, material, delivery time. payment item ect. |
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design |
| According to customers' request to build the mould. Before make the mould , |
| When mould are finished, we will test the mould to check it and send the sample for consumers' reference. |
| If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory |
8. Delivery | Delivery goods by sea or by air, according to customers requirement |
Mould Maintenance:
♦ Thermal oil: adopting the hydraulic oil for the maintenance to get in the inlet of cooling water, which can play a lubrication, rust-proof role.
♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
♦ It needs to be painted rust preventive if it stops production for long time.